
This is the first actual demonstration of hugely successful reverse engineering. The bridge, originally located at Indus River, was 3D scanned from a helicopter, the design was improved using 3D designing techniques at Viscous, 3D printed and put together all in one day. The body of the bridge has been constructed using eco-friendly and biodegradable materials. The material used was PLA with a glow-in-dark quality.
The model was 3D scanned, 3D Printed and put together under 17 hours by the Viscous team.
More such articles at: Viscous Posts/ Architecture